starfyrepo
← Journal Version Tracking

A Checklist for Deciding How to Track Versions of Your Cuts

Before you commit to a version tracking system, run through these questions about cuts, revisions and final exports so everyone on the team knows which file is current.

Priya Raman · · 6 minutes to read

A Checklist for Deciding How to Track Versions of Your Cuts

Start with what actually gets versioned

Before choosing any scheme, list the things your team produces that change over time. For most video teams that means project files, edit decision lists, graded sequences, audio mixes, caption files and the exports sent out for review. Each of these can have several revisions, and not all deserve the same level of tracking. A rough assembly that lives for a single afternoon does not need the same care as a client cut that goes through three rounds of notes.

I suggest writing the list on one page and marking each item as disposable, reviewable or final. Disposable items can be overwritten. Reviewable items need a visible revision number. Final items need a locked name and a clear place to live. Doing this first stops the rules from growing heavier than the work they are meant to serve.

  • List every file type that changes during a project
  • Mark each as disposable, reviewable or final
  • Decide which types need a revision number at all

Ask who needs to know which file is current

Version tracking exists to answer one question quickly: which file is the current one? The answer matters to different people in different ways. An editor needs to know which sequence to open. A producer needs to know which export went to the client. A colorist needs to know which cut is locked. If your rules only serve the editor, the producer will keep asking for confirmation by message, and that is the sign the system is not working.

Go through your roles one by one and write down the question each person asks most often. Then check whether your proposed rules would let them answer it without asking anyone. If a role would still need to interrupt a colleague, the rules need another pass, or the current file needs a more obvious home.

  • Name each role that touches the cut
  • Write the one question each role asks most often
  • Test whether the rules answer it without a message

Check your naming against real revision rounds

A naming pattern that looks tidy on paper can fall apart in the third round of notes. Take a recent project and replay its history using the pattern you are considering. Does it handle a small fix to an approved cut? Does it handle two people working on alternate versions at the same time? Does it still sort correctly in a folder listing once you pass version nine, or does v10 land between v1 and v2?

These are small details, but they decide whether people follow the rules under deadline pressure. I recommend padding version numbers, keeping the date out of the name unless the date genuinely matters, and reserving a single word such as final for one purpose only. Test the pattern on messy history, not on an ideal project.

  • Replay a past project using the new pattern
  • Check sorting beyond version nine
  • Reserve the word final for exactly one meaning

Decide where superseded files go

Every new revision leaves an older one behind, and teams often skip deciding what happens to it. If old versions stay beside the current one, the folder fills up and the current file becomes hard to spot. If they are deleted too early, you lose the ability to go back when a client prefers an earlier direction. Neither extreme serves a production well.

A workable middle path is a clearly named subfolder for superseded work, with a rule about when it is cleared or archived. Settle that rule now, including who is allowed to move files into it. Also decide how long superseded exports are kept after delivery, since those are the files most likely to be requested months later when someone asks what exactly was sent.

  • Pick one named place for superseded files
  • State who may move files there
  • Set a retention rule for delivered exports

Test the rules with someone who was not involved

The most reliable check is simple. Give a colleague who did not help design the rules a sample project drive and ask them to find the current cut, the last client export and the previous approved version. Watch where they hesitate. Hesitation points to a rule that lives only in the heads of the people who wrote it.

Keep the test short and do not coach them. Note each place they guess, then adjust the wording or structure rather than explaining it away. If the person succeeds without help, the rules are probably readable enough to survive a handover, a freelancer joining mid project or your own memory a year from now.

  • Choose a tester outside the design discussion
  • Ask for current cut, last export and prior approval
  • Record every point where they guess

Confirm the rules fit on one page

The last item on the checklist is length. If your version tracking rules need several pages of explanation, people will not read them, and the habits will drift within weeks. A good set of rules fits on a single page that can be pinned at the top of a shared drive: the naming pattern, the meaning of each status word, the location of superseded files and the name of the person who answers questions.

Review it once the first project has finished, because real use always exposes a gap. Adjust, shorten and date the page. Rules that are short, visible and revisited after one project tend to hold, while elaborate ones tend to be quietly ignored.

  • Pin the rules where the team already works
  • Include the naming pattern and status words
  • Name one person who owns the page

Deciding on version tracking is less about picking a clever scheme and more about checking that a simple one survives real work. Work through the list: what gets versioned, who needs the answer, how names behave over many rounds, where old files go, whether a newcomer can follow it and whether it fits on a page. If most answers are yes, you are ready to adopt the rules and review them after the first project.

Send us a message

418 Central Avenue NW, Albuquerque 87102(505) 214-0873[email protected]

© 2026 starfyrepo. All rights reserved.